4 Oct ACI Specifications for Tolerances for Concrete Construction and Materials and Commentary_自然科学_专业资料。ACI Lea ACI Specifications for Tolerances for Concrete Construction and Materials and Commentary de American Concrete Institute (ACI) gratis con una. ACI Specifications for Tolerances for Concrete Construction and Materials and Commentary [Editor] on *FREE* shipping on qualifying.

Author: Samum Moogumuro
Country: Bahrain
Language: English (Spanish)
Genre: Relationship
Published (Last): 15 July 2010
Pages: 227
PDF File Size: 4.46 Mb
ePub File Size: 7.12 Mb
ISBN: 375-7-84375-294-4
Downloads: 99549
Price: Free* [*Free Regsitration Required]
Uploader: Faemi

For one building, the initial camber at mid-span of the foot-long beam aci 0. For a listing of and access to all product errata, visit the Errata aci 117-06. When insufficient paste can be drawn aci 117-06 the concrete itself, use a cementitious materials grout made from the same source as the concrete.

New Surface Finishes for As-Cast Formed Concrete

Contractor must reproduce a mockup of the sample finish on an area at least square aci 117-06. A second article aci by Aci and K.

In such slabs, flatness is improved by adding more concrete to compensate for the deflection. Because these slabs deflect much more than floors aci 117-06 reinforced concrete frame buildings, the aci 117-06 afi F can also be expected to be greater.

Nuclear Hazards To Buildings.

Join Thousands of Fellow Followers Login or register now to aci 117-06 instant access to the rest of this premium content! This way, the mockup will show any color aci 117-06 between dry and wet loads of concrete. This agreed well with the measured deflection of about 0. Aci 117-06, bugholes have been indirectly addressed by specifying the size of surface voids that must be repaired.

But the conclusion that F F is not affected significantly by dead aci deflections has been applied to all building types. Errata are not included for collections or sets of documents such as the ACI Collection. Produce specified architectural finish including special textured and exposed aggregate finishes. If your order is damaged, defective, or incorrect, we acccept its return without question within 30 days of purchase. The deflections were calculated at 1 ft.

To predict what would happen to F F numbers if shores were removed and dead load deflection occurred before F-numbers were measured, aci 117-06 aci the mathematical analysis described below. aci 117-06

Specifications for Tolerances for Concrete Construction and Materials and Commentary

Essentially, the requirements for the other three formed surface finishes Matching Sample Finish, Rubbed Finishes and Architectural Finishes did not change in the revised speciation.

The older version, ACIspecified no form-facing material requirements for Rough-Form Aci 117-06 but had specific requirements for a Smooth-Form Finish that required the form-facing material to produce a smooth, uniform texture on the concrete.

When floor flatness and levelness of elevated slabs are measured using F-number technology, timing aci 117-06 measurements is critical because aci the short-term deflection between shoring and reshoring and long-term deflection after shores are removed.

The largest bay on this project was 39 ft. Rubbed finishes Smooth-Rubbed – No later than the day following formwork removal, wet surface and rub it with an abrasive such as a carborundum brick until a uniform color and texture are produced.

In these two reported studies, the assumption that deflections have a minimal aci 117-06 on flatness F-numbers was confirmed primarily because the buildings were stiff. When Aci was published, however, Section 4. The next two sections explore the effects of deflection on F-numbers and aci the change was made. In addition to showing the finish of the formed surface, mockups typically establish the minimum acceptance criteria for the as-built surface finishes.

If floor flatness is measured months or even years after the building has aci in service, F-numbers will be even more adversely affected because of long-term deflection resulting from creep. Otherwise, you may end up making costly repairs. Table 1 shows the results aci 117-06 this simulation. Anticipate formwork wear and tear as the project progresses. The composite flatness Aci values before and after shore removal were F F However, not all specifiers and contractors are aci of this change.

Concrete contractors should not cast aci 117-06 using new formwork but use seasoned formwork that represents the quality of the formwork that will be used on the project. The commentary on the Specifications for Tolerances for Concrete Construction and Materials ACI is intended to aci 117-06 used with ACI for clarity of aci 117-06 and insight into the intent of the aci 117-06 regarding the application of the tolerances set forth therein. Because the surface tolerances are specified in ACIclasses of surface and the corresponding tolerances did not change in the revised ACI specification.

Because ACI specifies the size of acceptable surface aci 117-06 or more specifically specifies what size voids must be repaired, concrete contractors should be able to avoid costly disputes and unexpected repairs. Thus, the higher the initial F F aci 117-06, the greater the effect of dead load deflection.

ACI required tie holes and surface defects to be repaired but failed to define wci defects. More information about deflection analyses is contained in Tolerances for Cast-in-Place Concrete Buildings, a book by the authors of this aci 117-06 and published by the American Society wci Concrete Contractors www. This requirement is similar to the old ACI specification that required a Rough-Form Finish for surfaces not exposed to aci 117-06 view and a Smooth-Form Finish for surfaces exposed to public view.

Any applicable errata are included with individual documents at the time aci 117-06 purchase. Here is a review of those specifications.

Classes A-D correspond with exposure conditions aci 117-06 aesthetic requirements of formed surfaces. Aci 117-06 next two sections explore the effects of deflection on F-numbers and why the change was made. If projections exceed these heights, ACI requires removal.