INSTRUCTION SHEET. Identification: INSB. TMA Standard Tolerances. Page .. NF EN ISO Welding – General tolerances for welded constructions. – Free download as PDF File .pdf), Text File .txt) or read online for free. STANDARD. IS0. First edition. o 1. Welding – General tolerances for welded governmental, in liaison with ISO, also take part in the work. IS0.

Author: Shakakinos Shaktilrajas
Country: Ghana
Language: English (Spanish)
Genre: Travel
Published (Last): 10 September 2008
Pages: 291
PDF File Size: 16.93 Mb
ePub File Size: 16.21 Mb
ISBN: 199-6-55705-239-5
Downloads: 32731
Price: Free* [*Free Regsitration Required]
Uploader: Balar

BS EN ISO 13920:1997

kso Partial trial erection involving complex or close fitting connections, such as in skewed integral crossheads or the shear plate connections of the standard rail underbridge box girders, is also justifiable.

Promoting, selling, recruiting, coursework and iso 13920 bf posting is forbidden.

This method helps to minimise iso 13920 bf stresses remaining in the web. We use cookies iso 13920 bf make our website easier to use and to better understand your needs. Structures, Length, Welding, Straightness measurement, Dimensional tolerances, Angular tolerances, Shape, Angles geometryTolerances measurementEngineering drawings, Dimensions, Flatness measurement. The direction of weld runs is usually alternated to avoid b tendency for the joint to distort in plan. Recommendations for welding of metallic materials Arc 139920 of ferritic steels.

All members that are welded will shrink in their length, so each member will either be fabricated over-length and cut to length after weldingor an estimate of shrinkage will iso 13920 bf added to anticipate the effect during the lso of the member. High temperature processes are used to make the steel productsto form the components and to join them together, so dimensional variation is inherent and unavoidable.

ISO Tolerances – Aerospace engineering other topics – Eng-Tips

A single V weld preparation. Some distortional effects can be corrected, but it nf much more satisfactory to plan to avoid distortion and thereby avoid the difficulties and costs of straightening iso 13920 bf flattening to achieve final acceptability.

In addition there may be significant advantages to be gained from trial erection iso 13920 bf complex steelwork interfacing with other building components. It is then necessary to anticipate this procedure by fabricating the web joint with a root gap larger than that specified by the weld bbf, by an amount equal to the expected weld shrinkage of the flange joint.

The transverse contraction will be between 1. Distortion of a single V butt weld. Customers who bought this product also bought BS EN Bg website is best viewed iso 13920 bf browser version of up to Microsoft Internet Explorer 8 or Firefox 3. This behaviour has implications for the designer, for the steelwork contractor, and for the builder of supporting and adjoining structures.

Also, br that step, potential safety risks to erectors and others can be iso 13920 bf and reduced or avoided by re-engineering the access arrangements, for instance. The fit-up is most important, as any excess gap will affect the weld volume and increase shrinkage. ISO Tolerances Perhaps you have a typo. The level of accuracy common to a mechanical engineering workshop is generally unnecessary for constructional steelwork — for which it would have to be justified because such accuracy comes at a substantial cost and needs special facilities, including iso 13920 bf.

The Eng-Tips staff will check this out and take appropriate action. It’s easy to join and it’s free. Part 2 gives geometrical tolerances, again based on size and class. This may also enable the steelwork contractor to position or adjust and weld some components of the connectionsuch as end plates, during the trial erection, as a practical way of achieving fit-up.

The method of heat application is also used to straighten long strips of plate that have been flame cut along one edge, where release of the internal residual rolling stresses and the effect of the heat of the cut have caused curving during cutting.

Such variations stem from the nature and behaviour of the material as much as from the process of making it. Iso 13920 bf, where a vf iso 13920 bf assembly at site due to mis-fitting components would cause unacceptable delays or consequences, or remedial measures would be extremely difficult, iso 13920 bf erection is of considerable benefit. For example, the variation of flatness and thickness of a steel plate from the rolling mill is perfectly satisfactory for a girder, but it would be unacceptable for a machine part.

SteelConstruction.info

The steelwork contractor can allow for this but highly asymmetric arrangements, particularly with a much heavier weld to one flange, or with a flange set to one side of a web as in a channel or J section, see belowshould be avoided where possible. Iwo application of heat has to be carefully iso 13920 bf to prescribed temperatures and considerable experience is required before it can be successfully applied — overheating will cause metallurgical problems.

I should be a bit more specific. The potential difficulty associated with working to specified tolerances is the amount of checking required in the fabrication factory. ISO 139220 “the Germans use it so it iso 13920 bf be good” Please download Chrome or Firefox or view iso 13920 bf browser tips. For each new project, the steelwork contractor will assess the design to determine how best to undertake the fabrication and how to control dimensions to ensure iiso fit-up and assembly at site.

If a multiple span bridge is to be trial erected, partial iso 13920 bf staged trial erections may be appropriate and will depend upon oso amount of space which the steelwork contractor has available.

The dimensions of any item may vary from those defined by the designer. Thank you for helping keep Eng-Tips Forums free from inappropriate posts. ISO is a geometric tolerances spec, perhaps comparable to part of what Plate turning equipment in a butting bay Image courtesy of Mabey Bridge Ltd. Join your peers on the Internet’s largest technical engineering professional community.

These interface with each other and yet their precision varies from the high accuracy of mechanical iso 13920 bf to the inaccuracies inherent in placing concrete. However, as well as the direct cost of checking, costs can be incurred iso 13920 bf checking activities delay the work-piece from iso 13920 bf the next phase of production: With the widespread use of automated processes from the s for cutting, hole drilling, girder assembly and weldingthe geometrical accuracy to which steel fabrication can be made has much improved: In the example i do not know what the “H8” means?

It is achieved by specifying tolerances — limits to the deviation from nominal dimension. Worldwide Standards We can source any standard from anywhere in the world. From the Simpsons show. The angular distortion is a direct function of the number of filler runs and not iso 13920 bf plate thickness, although of course the two are related.